Report
Thesis real, instruments scarce: best structures are long NB into the EXIM close, the BE-puts-vs-NB/SRL pair, and SCY.V as the un-rerated cousin. No futures/ETP exists; REMX is not a proxy. Nov 2026 truce checkpoint is the dated catalyst.
Free to readRead report
